Tag Archives: switching

Why I chose not to design my layout – part 2

Introduction

In my last post (Why I chose not to design my layout – part 1) I discussed some of the reasons for ‘eyeballing’ my new layout and not ‘designing’ my new layout. This time around I wanted to clarify any uncertainties around the design process, and continue on with some meta-data about the design to help me clear my vision of the layout and the eventual role I’d like it to take in the future.

The Mod. 1, Mark 1 Eyeball

There is nothing better than eyeballing a space, and understanding how all the elements fit together. Obviously it makes the process easier if you understand what you aim to make, and have a sense of perspective on the amount of track you can reasonably have within the bounds of the layout space.

The layout’s story

My layout’s story revolves around switching within an industrial park. Service delivery is the primary focus of the layout and thus switching is the primary activity of the layout. With the design I wanted to be able to have a train:

  • arrive from the class 1 partner (interchange track),
  • be brought into the industrial park (switching yard),
  • switched into job lots for delivery within the park (customers), or to off-spot storage (storage yard),
  • run out to the customers needing switching that day, switch the site and then return to the yard,
  • have outbound cars switched and readied for delivery to the class 1 partner, and finally
  • have the outbound cars switched to the interchange track

Because I expect to have multiple small operating sessions each week, independent jobs that allow me to complete a little part of the operating session (between 30 – 50 minutes) each day I need a layout that supports that kind of operation.  Should I manage to get a couple of people over who want to operate a full session, we can simply pick up the next job sheet and continue on from where we started.

Why the design I’ve come up with?

A multiple industry layout was always my goal since I decided to build another layout in 2003. You can see some of these layouts in the Layout Design Gallery (Offsite Link), or directly from the ‘Resources’ section below.

I read about the Modesto & Empire Traction in Model Railroader many years ago, and have a lot of research on them. But as we don’t own our own home I am loath to build something bigger than my current proposed layout even semi-permanently at the moment. So I’ve gone down the path with my own module design, that can be added to over time. Another influence was the Progressive Rail layout that MR did several years ago. Again too big for me, but there is a core of the operation that I can mimic in the space I have.

In the next post ‘Why I chose not to “design” my new layout – part 3’ I’ll review my ideas on the operational aspect of the layout; the proposed paperwork that I want to use. It’s getting late and Sons of Liberty is on the Tele tonight. From Ballarat, on a cool and clear evening – good night.

Resources:

Multi Industry Switching Layouts

 

Site Seeing February 21

It’s all operations Saturday, thanks to Martin Hogg, the owner and operator of Brett.

Site 1: Brett – a full operating session video

Martin Hogg’s released a new video (Brett’s been featured recently on the blog).

This time you get to see a full operating session from start to finish.

This video shows just how much enjoyment you can derive from switching on a relatively small layout with a reasonably simple track plan.

I’m guessing the operating session lasted around 25 – 30 minutes from start to finish. As soon as I get some feedback from Martin I’ll update this post and let you know for sure.

Good work that man! On you Martin.

Update 1:
I talked with Martin Hogg today and he confirmed that the operating session takes about 25 minutes (although he says its heard to be sure as he was busy phaffing around with the camera to be sure). He’ll be running another session to confirm that but I’m pretty sure that it’ll be right around the 25 minute mark, depending on the work to be done.

Site Seeing 18 February

Introduction

The IAIS Grimes Industrial Line

1 – The IAIS Grimes Industrial Line

In my site seeing post yesterday I mentioned the publishing bonanza we’ve inherited thanks to the internet. One of these great sites is the free (as in Beer) internet Model Railroading Magazine – the Model Railroad Hobbyist (Link Here).

Apart from a great magazine that I’ve read since issue number one, there are the modellers blogs that are associated on the site. Among the best of the blogs is the Grimes Industrial layout blog of JFMcNab (Link Here).

You can also see a range of photos from his layout on the Unofficial IAIS Railfans website (Link Here).

Take some time and take a look around and discover the Grimes Industrial Line. I think you’ll enjoy the Grimes Line sites.

Resources:

Watch one of James’ videos from his YouTube channel:

Site Seeing February 02

Introduction

Often I wonder how I can fit the layout I’d like to have in the space I have available.

Then there are the brave souls who decide to build an industrial switching layout in 1:29 G scale.

Losco yard

Losco yard is Hugh Flynn’s switching layout in 1:29 scale. I found this today while looking for something else entirely. But I like the design and the bulk of the models so much I thought it deserved to be brought to a wider audience.

Link number 1 is an older link from 2008 but shows a lot of photos and a track plan, along with some thoughts from the RMWeb community as to what could be done to make the operational value better.

Link number 2 is a newer version of the layout and some other work in progress. According to the owner, the layout has since been sold on.

Link number 3 below is a link to a video taken by a punter at one of the UK shows of said layout. Only 480P but it gives you an idea of the size of the models when you take a look at the video and realise that there are massive models. Note that the audio track is quite loud, so turning down your sound at work might be advisable.

The video runs from the start through to the 2:20 mark. Nice one Hugh.

Resources

There are some other nice photos on the modelrailroadforums page here:

http://www.modelrailroadforums.com/forum/showthread.php?9761-Weekend-Photo-Fun-10-3/page3 – look at the 5 photos starting just below the top of the post.

There is also a whole heap of track plans by Hugh here if you are interested.