Tag Archives: operating

That train won’t run itself!

About 40 minutes worth of fun

That train won’t run itself!

This is the joy of operation. Layout not finished? No problem. Keep operating until you get around to it.

And you’ll be happier since theirs no remorse involved for not having a finished layout.

Enjoy the link.

Site Seeing – The Super Duper Switch Stand Edition – 9 September 2018

 

Using Sunset Valley Railroad switch stands on the layout

Operating realism is very important to me. It ensures that those working my layouts move at a realistic pace and in a realistic way. Switch operation is a big part of that goal for me.


The source of inspiration – Port Rowan in 1:64

Originally inspired by a post on Trevor Marshall’s Port Rowan blog, I want to include these switch stands as a part of my operating realism approach.

I particularly like the fact that Trevor uses a single style of padlock to lock the switches along with a length of chain. This ensures that all switches must be unlocked before use, and relocked after use as happens on the 1:1 railroad.

As Trevor says in the blog post, they are more expensive than other simpler options. However, I think that if you have a small layout, and realistic operation is your thing, then the cost is worth it. And they’ll last forever.

I’ve wanted to share this post for a long time, but only recently found all the links again after long searching. I hope you enjoy reading about this and get inspired.


Resources