It’s been a while right?
Shift work, long days, cold nights, and all that stuff.
The good news is there’s a batch of content coming focusing on Locomotive, and Railcar maintenance facilities… you are going to love it. How to model each one, operations possibilities and all in a small space. I want to thank Rob Chant and Aaron Riley for beginning the discussion on Facebook.
Here’s a taste of what’s coming over the next few days! The day it posts depends on how I feel after my second COVID-19 vaccination tomorrow. Here’s hoping for the best outcome and no headache, etc.
There’ll be more posts to come during October though covering a range of topics from the micro size to the mammoth 8′ x 2′ footprint, including:
- Motive Power Depots (MPDs) for diesel or electric locomotives,
- Electric Multiple Units (EMUs), and
- Diesel Multiple Units (DMUs) throughout October.
Aaron Riley’s Metra Railcar Facility layout
Based on a Rob Chant design (more on that in the next post) Aaron has built a cracker ‘L’ shaped layout in only 96″ x 53″ with a width of only 18″.
This is a taster, there’ll be more in my next post!
Resources
- Visit Rob Chant’s Facebook page for more great designs.
Staying in Contact
Interested in keeping in touch or discussing posts, pages and ideas? You can do that in several ways:
- Drop me a line using the form on our About page here at the site
- Connect with us on the Andrew’s Trains page on Facebook