Category Archives: Publishing

Site Seeing – December 2025

It has been a while, I know. I promise you, it’s me, and not you. However, there are some really neat free (as in beer) e-zines that I’ve found over the last couple of days that I just had to share with you. Let’s get into them.


Free E-Zines

Free, yes, you guessed it, free as in air, electrons and radicals.

  1. Produced by the “Toowoomba Model Railway Club Inc.” in Queensland, Australia (that’s the pointy bit of our country on the right-hand side), Train Talk is a monthly publication. Certainly club-based, but plenty of modelling information inside too. You can read online or download it here: Train Talk
  2. Railway Modeller Australia, another E-zine in Australia, is a reincarnation of Rail Modeller Australia magazine, which was started in June 2020 by Robyn Taylor. I could not find any mention of the original in my searching, though. Lots of modelling content and well worth the read. You can read online or download it here: Railway Modeller Australia
  3. This last one you may already know about, but super worth mentioning. Ian Holmes has been producing the Micro Model Railway Dispatch for nearly 5 years now. For those of you looking into small layouts (and I know you are), this is a great read. Produced quarterly, get on Ian’s mailing list to get a reminder when the newest E-zine is available for download. Head over to the website here: The Micro Model Railway Dispatch

Finally, Ian Holmes has a new E-book available for download. A Journey into Micro  Layouts. I’ve just bought the book, and as soon as this is published, I’m off to read it. Available from Ian’s Buy me a Coffee page. Not free, but more than well worth the low cost (I only paid A$15.53 in Australian Pesos for what I think is a US$10.00 book).

And that is all for this Site-Seeing adventure.

.


Staying in Contact

Interested in keeping in touch or discussing posts, pages and ideas?  You can do that in several ways by:

      • Commenting on this post (I read and answer each one)
      • Sending me a note using our About page (email)
      • Connecting with us on Facebook at Andrew’s Trains

1 August 2025 – The Journey of a Thousand Miles

First channel video (talking about the channel and what I intend to make of it) releases to YouTube on Sunday, August 3rd.


It has been a journey

This common saying originated from a Chinese proverb. The quote originates from Chapter 64 of the Tao Te Ching, attributed to Laozi. This saying teaches that even the longest and most difficult ventures have a starting point; something which begins literally where one stands.

I have had to relearn almost everything I knew since my last time working in this arena. My family has been wired, mic’d and are listening through good basic pro gear. Everyone has come on board to help out and get this done. Talk about standing on the shoulders of giants.

Thanks also have to go out to the following YouTube creators:

  • Wayne Fick (Created by Wayne) for his outstanding Canva video learning videos
  • Kevin Kolbe for his, unknown to him, continuing support and encouragement over the last several months

I aim to have a second video out by mid-August to kick off the topic of small layout operations. Then, one video will be released each month, on the first Sunday of every month, until the end of the year.

And yes, I know I said I’d do that last year, too. What I’ve learned since then is that I was overestimating my knowledge. My skills weren’t up to the level I needed them to reach a standard I believed the subject and those of you who’ve been reading this blog deserved.

I am at the bottom of the ladder now, but I’m pleased with what I’ve created, and I aim to better my skills as I go forward. I look forward to your feedback on the next post that will be out on Sunday morning, my time here in the freezingly cold South-Western corner of Australia.


Staying in Contact

Interested in keeping in touch or discussing posts, pages and ideas?  You can do that in several ways by:

    • Leaving a comment on YouTube starting Sunday, August 3rd 2025
    • Commenting on this post (I read and answer each one)
    • Sending me a note using our About page (email)
    • Connecting with us on Facebook at Andrew’s Trains

New home, and an unexpected wait for the internet

Moving on out

We’ve had to move twice in 12 months. This gets old fast when it’s not by choice. However, we’re now in a new house and we’ve a level of certainty that we have not had recently.

But, there’s a problem with that.


It’s like 1985 in here…

There is no internet, and our mobile phone reception is marginal on a good day due to our distance from the nearest cell tower.

We’re waiting on an electrician to come in to trench out and replace the current conduit, which ends 25 metres short of the pit in the street, so that the broadband company can connect us up.

The result is that hopefully sometime in February we’ll have the internet connected and I’ll be able to upload January’s video.

1985 is better than I remember it in someways, but worse in others. For now I’ll keep working on thing’s here in the Turdis, and keep carrying on.

I just wish you could see me typing this on my phone. It would be nice if I could make my sausage fingers work on it, like they do on the keyboard.

I’ll be in touch in a week or two. Assuming we’ve arrived in 1997 by then. I wonder if my CompuServe account still works?


Resources

  • Wish we had some

Staying in Contact

Interested in keeping in touch or discussing posts, pages and ideas? You can do that in several ways by:

    • Commenting on this post (I read and answer each one)
    • Sending me a note using our About page (email)
    • Connecting with us on Facebook at Andrew’s Trains

No plan survives first contact with cancer

Promises, Promises

In a post dated November 2023, I mentioned that I had plans for more content during 2024. Unfortunately, health complications came along.

An ongoing battle with Colon cancer (since 2015) came to a head along with a more recent workplace injury to add injury to insult.

I found it difficult to focus on tasks outside of maintaining my health. Together, the two challenges overwhelmed me. Leaving me exhausted at the end of each day.

My thanks go out to you for your support and for remaining a subscriber, especially over the last two years.

But, it would appear that things are looking up. My doctors have told me that my cancer is finally under control. My workplace injury is getting better which has also been a long painfilled road.


Looking forward

Therefore, here’s my focus for 2025.

I’ll be producing new content just for you. If you are someone into small layouts who is interested in getting into or improving their current understanding of operations, then I’m here to support you.

Whether you are at the start of your journey or further down the track, I’ll help cut the effort it can take to learn about and understand rail operations.

I’ve been reviewing my current operations content to make it better and to support the upcoming video content.

The topics I’m going to tackle first are:

  1. what is the meaning of operations in a modelling sense
  2. what that means for you the small layout owner/builder
  3. why operations are important for your small layout, and
  4. how you can make it work for the layout you already have

My challenge is to post the first video before the end of January 2025. I’m challenging myself to complete one operations video each month throughout the year.

I’d love to hear your thoughts on what you would like to see covered in these and other videos. Please get in touch (more details in the “Resources” section below).


Happy New Year!

Finally, I want to wish you a safe, and prosperous new year. (I missed wishing you a Merry Christmas – my apologies.)

I hope that the end of 2024 sees you and your family in good spirits and health and I want to wish you and yours the very best for the new year.

Resources

Staying in Contact

I hope you’ll keep in touch and discuss posts, pages and ideas!  You can do that in several ways:

Modelling Master Class – Boomer Dioramas

I’ve been watching the Boomer Dioramas’ channel for over a year now. I never cease to be amazed by his skill, dedication and most of all, his artistry. This two-part series is a standout.

I hope that you’ll enjoy learning the skills, tips and tricks that Boomer uses to build this mixed media kit. Apart from being a beautiful little kit, there is a lot of scratch building that elevates the kit from good to brilliant.


Building Showcase Miniatures Wrecker

This two-part series is an absolute must-watch. I’ve learned so much about building mixed media kits just watching. And I’ll be referring back to them regularly to increase my skills as I have several kit builds that have stalled because of my limitations.

Part 1:

Part 2:


Resources

Staying in Contact

Interested in keeping in touch or discussing posts, pages and ideas?  You can do that in several ways by:

    • Commenting on this post (I read and answer each one)
    • Sending me a note using our About page (email)
    • Connecting with us on Facebook at Andrew’s Trains

Reworking the Maintenance Centre Layout for modern prototypes

Overview

This all started when I saw a Facebook post by Aaron Riley showcasing his Metra Service Centre layout, adapted from a Robert Chant design, in HO scale. I reached out to him and asked if he’d be willing to share more about his layout with us all. Aaron was gracious and extended many images and much information about his layout that allowed me to create that initial post. What most struck me from the outset was that the layout in the photos does not look like what it is, a small footprint layout. It appears larger while providing a great deal of operating potential that would provide many years of interesting operations for anyone interested in building from Rob’s original design.

Inspired by the layout I pulled information from my day job working in a similar location and wrote the Operations for Maintenance Centre Layout Series (see the links for all 7 parts in the resources section below). While you don’t need to read all of the posts before taking on this post, there is a lot of contextual information there that will help in understanding the redesign that I’m proposing.

I want to take Rob Chant’s original layout design, which is more suited to an earlier time of operation (say through the early to mid-1990s) and bring it into the 21st century. Those not in the rail industry often think that maintenance centres change little over time. Nothing is further from the truth. As operational needs and operators change, major often drastic changes to facilities occur that allow operators to streamline and manage throughput (lowering costs in the process). My depot has changed twice in the last 20 years. Each time with major additions to its layout.

Enough preamble, let’s get into the meat of the article and look at how to bring Rob’s design into the modern-day.


Rob’s Original Design

For reference here is Rob Chant’s design, as used by Aaron Riley to build his layout. I’m going to be referring back to this image quite a lot. It may be worthwhile to either open a new window, or another tab with this image to make referring to it easier.

Rob Chant's original Track Plan with numbers keying to Aaron's gallery of photos
Rob Chant’s original Track Plan with numbers keying to Aaron’s gallery of photos

Bringing the layout into the 21st Century

The design below mirrors, to some degree, what I see at work every day.

A running depot for passenger operation of diesel hauled push-pull train sets
A running depot for passenger operation of diesel hauled push-pull train sets

Comparing the two designs you’ll notice right away the differences. The second design is streamlined and devoted to one function: getting train sets out of the gate and onto the mainline and the reverse as needed. To cover all of the changes I’ll start on the left and move to the right.

Parts Warehouse – GONE

Starting on the left top of the layout you’ll notice that the parts warehouse is gone, along with the scrapping line, sand house and locomotive shed. In modern facilities such as this, all parts have been moved into the main maintenance sheds and are now delivered by road. Except for rolling stock being returned from upstream maintenance centres, nothing arrives by rail.

Scrap Line – GONE

Scrapping too has moved off-site. As I mentioned in the article series major maintenance is carried out off-site at what I term upstream maintenance centres. Determination of end-of-life status for railcars and locomotives happens at this higher level and not at the running depot level.

To help you understand why running depots no longer have the means or the authority to scrap rolling stock onsite let’s go down the rabbit warren to understand the three major reasons for removing rolling stock from the asset register (or roster if you prefer):

  1. Condemnation occurs when rolling stock is:
    • life expired because of age, mileage covered, or material stress such as fractures in frames, failures of major high-cost components
    • determined to be uneconomic to continue to maintain or repair, often because of the rising cost of replacement parts or  sub-assemblies driving ongoing maintenance costs above those of outright replacement
  2. Withdrawal occurs when rolling stock is:
    • considered to be excess to current need due to adverse economic circumstances such as a downturn (COVID caused a lot of this), which usually means the asset will be stored out of service until needed later on by the operator,
    • determined to be no longer required by the operator, yet is still  in a saleable and serviceable condition in which case it will be put out for tender by interested parties and often sold into service with another operator, and finally
    • determined to be no longer required for operation by the operator, but usable as a source of spare parts to keep other similar units running by the operator
  3. Accident damage occurs when rolling stock is:
    • involved in an accident and has suffered damage sufficient to make the cost of refurbishment equal to or more than the value of the asset, its insurance value, for example, it will be stripped of usable parts by the maintenance teams, and then sold by tender to interested scrappers

Locomotive Shed  – GONE

Locomotives are generally left out in the open on an available track spot, so shedding is no longer required. All light maintenance that can be carried out at the running depot would be carried out in the regular maintenance sheds. These items would include checking and topping up fluid levels, replacing minor components such as oil filters, light globes, brake blocks, windscreen wipers, cleaning the crew compartment, emptying waste tanks, etc. All other maintenance items would be carried out at the upstream facilities.

Bulk Oil & Diesel Tanks – MOVED

The bulk oil tanks for locomotive fuel have been moved to the area near the admin offices. This allows for trucks to deliver directly to the tank area. No supplies are received at the running facility by rail. The tanks can be serviced by trucks 24 hours a day, and most likely receive a top-up on Monday, Wednesday and Friday.

Road Vehicle Garage – MOVED

With the focus changed to getting train sets serviced and onto the mainline, road vehicles have been moved off the layout. Any of the greyed areas can act as parking spaces (so long as there is clearance between trains and vehicles).

Crew Amenities Building  – ADDED

The crew amenities building and the cleaners annexe have been added to provide better facilities for change rooms, meal (mess) areas, toilets and training rooms in line with modern practice.

Hazardous & Waste Storage – MOVED

These two sheds have been moved to the maintenance shed (off layout) in line with modern practice.

Paint Shop – GONE

All paint-work has been moved to the upstream maintenance centres.

Contaminated Storage Tanks – MOVED

As with the other storage buildings mentioned above, all of this storage is now contained within the maintenance building footprint.

Bulk Sand Storage Silos – MOVED

Sanding facilities have been moved to the roof of the maintenance facility to save space and simplify sand delivery to sandboxes wherever it is needed. Sand delivery comes in by road at the rear of 4 road on the paved area there. There is an air feed sand line that runs across the top of the maintenance sheds to the loco sanding facility between 9 and 10 roads.

As an additional point of interest, passenger cars can be filled by a sand buggy (not a dune buggy, unfortunately) that allows sand service to passenger cars when and where needed in the facility. The sand buggy has its own air supply to blow sand into the sandboxes.

Road Numbering – ADDED

Each road has been numbered and is used as follows:

  • 1-3 are for ‘ready; train set storage, that is these sets are ready to run out onto the mainline.
  • 4 through 8 are maintenance roads where:
    • 4 road is the washing road.
    • 5 road is the wheel lathe road.
    • 6, 7 and 8 roads are all pit roads for general service and maintenance of train sets.
  • 9 and 10 roads are for locomotive storage and supplemental sanding
  • 11 road is the locomotive fueling road

Modellers should note that fueling and sanding may occur without interfering with maintenance activity on 8 road. 9 road may be designated the locomotive arrival road. And when time allows sanding can happen here, before the locomotive goes to 11 road to be fueled. After fueling the locomotive can be stored on 10 road until needed.


Wrap-Up

This is the last post in the current series based around Aaron Riley’s excellent Metra Layout. I’ve tried to share my knowledge of the operation of these facilities and I hope that you have gotten something from the series. If you have a comment on what you’ve enjoyed and would like more of would be appreciated.

I’ll be moving on to looking at how I would operate the Australian RIP track layout I posted about some time ago. I have another very small layout design that I am working on at the moment in that vein, and I wanted to see what sort of operations you can have on a 4 foot long RIP track layout to keep it interesting. More on that in the next post.

Resources

Aaron Riley’s Metra Layout

Operations on a Maintenance Centre Layout Series

Staying in Contact

Interested in keeping in touch or discussing posts, pages and ideas?  You can do that in several ways:

Recovery, Delayed Posts and the flat-out best Chain-Link Fence tutorial ever!

I wrote back in December 2021 that I caught “the virus” and was hoping to be over it in short order. Yeah, well that didn’t happen.  Read on…


Recovery and Delayed Posts

What doesn’t kill you gives you a set of unhealthy coping mechanisms and a dark sense of humour” – Unknown

So, what started out as an optimistic case of COVID-19, turned into a 7-week absence from work, including 5 weeks (solid) of 24 hour-a-day coughing fits, being as weak as a kitten, and 2 plus months of continual work to get back to my fitness level. I get that everyone’s story with COVID is different. I was lucky not to have ended up at the hospital, but it was a close-run thing. Thankfully, Australia’s public health system held up and is outstanding; I had a fantastic team on my side made up of my GP, The Royal Melbourne Hospital‘s COVID triage team, Nurse-On-Call, family and friends to help out. Seems that raising a child is not the only thing that requires a village.

I’m still finding that overwhelming tiredness at the end of the day remains. Each day that goes by, thank the fates, I am still here and getting back toward normal. While my wife caught COVID, it was less aggressive with her than with me. It would have been better not to have caught it at all. I’ve now had my 3rd vaccination and hope not to catch it again. Let’s just hope that it turns more benign as time goes on and as we become used to having it in the world at large.

If you’ve been through it I hope that you are O.K. and that your family and friends likewise are on the mend.

Needless to say, posting has been delayed as life, in general, has taken priority. I hope that you will stick with me as I get back on track to work on finishing the last post in the “Operations on a Maintenance Centre Layout (Part 7 – Op till you Drop)” series. In this post, which I’ve begun working on again will take us through an op session on the layout. I aim to finish that soon.


Chain-Link Fence Tutorial

Boomer-Diaries on YouTube has been a must-watch, that I found during my time watching ‘everything’ on YouTube during my convalescence. He recently posted what I feel is the best Chain Link fence tutorial I’ve ever seen or read. I’ve linked it below. Watch and enjoy as you get a masterclass in how-to modelling, painting and dressing a great scenic item.

Once you go down this rabbit-hole though, you may be some time, to misquote Capt Robert Oates (of Scott’s doomed Antartcic expedition) as Boomer diaries has a big collection of outstnading videos on the current layout build.

Talk more to you all soon.

Andrew


Resources

This series so far:

Staying in Contact

Interested in keeping in touch or discussing posts, pages and ideas?  You can do that in several ways by:

    • Commenting on this post (I read and answer each one)
    • Sending me a note using our About page (email)
    • Connecting with us on Facebook at Andrew’s Trains

Merry Christmas 2021

2021 has been a year of challenges, setbacks and the odd major problem. My family and I have worked hard to get through the year. We feel blessed to have made it to the end of another year.

We hope that Christmas finds you and your family in as good place. That you and your family are well and able to enjoy tomorrow to the fullest.

I look forward to bringing you more content, including the final post of the Metra layout series, covering the playing of the operations game soon. There are a few more similar layout ideas I want to share in the new year too.

In 2022 I’ll be completing the Evans Hollow industrial switching layout. I look forward to sharing the rest of the build with you.

I’m going to take a couple more days off before I begin the next post. The road out of COVID-19 has been harder on me and my family than we planned. I hope you’ll bear with me as I continue my recovery.

It’s our hope that you enjoy the holidays. I’ll see you in the new year. Thank you for being a part of the blog and for coming back time and again.

My family and I wish you and yours a safe, joyous and a Merry Christmas and a Happy New Year. All the best and we’ll meet again in early 2022.

Andrew and family.

Operations on a Maintenance Centre Layout (Part 6 – Service Patterns & Impacts)

Before we dive into playing the game, I need to make sure I’ve not proceeded on assumed knowledge. That is, assuming that what I  know – you know. Let’s follow that thought down the rabbit hole.


Understanding Service Patterns

Passenger operations (from a depot perspective) are not regularly discussed in the modelling media, which is a crying shame. And rarely does anyone write about modern-day commuter operations in-depth in a way that would help modellers understand the operation. And that’s an even bigger shame because there is a whole realm of modelling operations that modellers are missing out on.

In this post, I want to start discussing how things are where I work, from a higher level operations point of view. In this pre-game post I’ll be covering three major topics:

  1. service patterns, covering the different times and traffic patterns during
    • morning run-out,
    • morning peak,
    • inter-peak,
    • afternoon peak,
    • evening,
    • evening run-in, and
    • overnight services
  2. how operations staff (drivers, conductors, etc) report and deal with issues, and
  3. how service patterns affect the maintenance side of operations (locally and upstream).

Once we’ve covered this the situation cards and overall game-play will make a lot more sense. And most importantly we’ll all be on the same page (or card).


Understanding Service Patterns

If you can get them, commuter system timetables tell us a lot about how a system operates. Primarily they give us the number of how many services run at certain times of the day, known as headway. Headway is the time between passenger services. Non-peak services operate with greater headways than do those services running during peak times. In our case (at work) we have the following general time frames. It should be noted that from Sunday through Thursday we do not run services throughout the night. These are exclusively for Friday and Saturday nights when the party animals come out (well they do now after two years of COVID-19). Services local to you will likely be different in their operating patterns, so a little research will be needed to understand how your prototype operates.

How our timetables are set out

Our timetables are built around four distinct service day patterns:

  1. Monday to Thursday,
  2. Friday,
  3. Saturday, and
  4. Sunday

Each requires a different operating pattern and time spread. For our operators (we have a driver-only operation), day’s start one day and finish in the morning of the following day. So you’ll note that times exceed what would be considered normal 24:00 hours. 25:00 hours means 01:00 the following morning and so on.

Services for operators run in only two directions: UP or DOWN.

In your jurisdiction, they may be EAST and WEST, or NORTH and SOUTH or another combination of these. In the UK (where we took our ideas from) services are also UP and DOWN.

Let’s dive in and understand what each one means for you as a modeller.

Morning run-out (05:00 – 07:00)

With no services running overnight the early morning period is about getting services out from the depot to do two things:

  1. getting the first service from the depot to the end of each line served such that they are ready to run the first full (end-to-end) service, and
  2. establishing the pre-peak morning headways.

Starting headways are 20-minutes, and are down to 10-minutes by 07:00.

Morning peak (07:00 – 10:00)

From the end of the pre-peak period services begin to surge out of the depot. Headways come down from 10 minutes to as little as 5 minutes. After about 10:00 AM those 5-minute headways begin to extend. With sets coming in off the road and back to the depot our headways double during the morning from 5, to 7, to 8, and finally to 10-minute headways. By the end of the morning peak, only half of those peak services are running. The rest are parked up and snoozing back in the depot.

Inter-peak (10:00 – 16:30)

The inter-peak period keeps the same 10-minute headways that were established during the end of the morning peak. This is usually the most settled period of the day with a little upward blip as people go about their shopping and move around the city for work.

Afternoon peak (16:30 – 19:00)

The afternoon peak is the same as the morning peak, with the exception that people are generally going home instead of coming to work. Train sets that were sitting at the depots begin to surge out once again. Usually cutting in between other services, and so cutting headways from their 10-minute or longer inter-peak times to as little as 5 minutes again. Just as it was in the morning, services begin to lengthen headways toward the end of the evening peak. With the services running in toward depots from their furthest station, some running in-service, others running as out of service express movements. Usually, by the 19:00 hour mark, we are out to 12-minute headways.

Early to Late Evening (19:00 – 22:00)

The bulk of peak services have gone from the rails by 19:00 hours, not all, however. Services continue to run into the depot, at a slower pace than earlier, until almost doubling the headway from 12 to 20-minute headways by 22:00 hours.

Night to Final Run-In (22:00 – 25:00)

Services from the beginning of this period to its end remain at or near the 20-minute headway set earlier in the evening. In general, our last two or three services from each end are run-in services and cover a little more than half the stops (since our depot is roughly in the middle of the lines we service). By just after 25:00 hours all train sets are back in the depot and the cleaning staff are going to work, cleaning internally and also sanding our sets overnight. This ensures that they are ready to go for the morning services only four hours later.

Weekend (Saturday & Sunday) Services

In general, Saturday services run an hour longer than normal and come into the depot at around the 26:00 hour mark.

Headways begin at 20 minutes in the morning, dropping to 10-minute headways throughout the day until evening when the timetable moves out to 20-minute headways until the last service at around the 26:00 hour mark on Saturdays. Sunday services have similar headways with the last service finishing at our depot around the 25:00 hour mark.

Overnight (Friday & Saturday) Services

Friday and Saturday all-night services are only on one line for our depot. This is fairly common through most depots in our network. These are primary lines with the highest patronage and assist in getting the night-owls home after their big night out.

Running on 30-minute headways from 01:00 through 05:00 hours (from which time regular services take over) these services remain out on the network until around 07:00 hours and then return to the depot for cleaning and servicing.

Public Holidays

Public Holidays are treated as Saturday timetables. The differences are that all services end one hour earlier and that there are no all-night services.


How operators deal with on-road issues

For our operations’ staff all technical and mechanical (train set) issues are reported in one of two ways:

  1. To the depot starters (before leaving the depot) during crew preparation and testing, or
  2. To the Operations Centre or OC (after leaving the depot).

In situation one, the set is failed by the crew, a replacement set is assigned to the crew, and the testing regime begins again. Once the set is tested and found fit for service it leaves the depot. Failed sets are assigned to the maintenance staff for rectification and eventually released for service.

In situation two, faults on any set become a problem for the OC. They assist in troubleshooting and fault clearance. If the fault cannot be cleared, but the set is movable, we get to the next platform, alight all passengers, and the train set is returned out of service to the depot for further attention.

Major issues require higher levels of assistance, and it is here that the heavy trucks and technical support crews come into play. They provide the first response mechanical and technical support to get sets moveable and recovered to a safe, off the mainline, location. Often these incidents cause delays (from normally timetabled services), diversions and or short running (where services are rerouted or run a shorter shuttle service) to the platform nearest the failed set. In some instances another train set is brought up to propel or pull the failed set to a safe location for stabling, or to get it back to the depot.


How service patterns affect maintenance staff

Our primary maintenance crew are scheduled for day shifts. This is when the most mechanical and technical service happens. You’ll need to do some research as I’m sure that your prototype will do things differently.

Late evening to overnight (our maintenance staff work 12-hour shifts) see our roving crews going to outlying depots to perform maintenance work on reported failed sets to prepare them for service the next day.
Generally, the maintenance staff do the most work during day shift hours. This is because the depot is generally empty, so moving train sets, and single cars around is much easier, Something to think on when you are planning your own operations. After hours with train sets coming backing into the depot, switching/shunting space rapidly runs out. Evening work is relegated to those maintenance shed roads, already filled with cars and sets switched/shunted their from earlier in the day, or assigned to one of the said tracks when the crew car it in at the end of their run. We find little switching/shunting is done for maintenance after hours.


Takeaway

I hope that I’ve been able to give you a high-level overview of the operations with which I am familiar. It is important (I feel) that you understand how things work before we dig into the game. Context is key in my mind so understanding how things work gives you the context for getting the most from the gameplay.

I promised that this post would be published last weekend, for which I apologise. Life does get in the way and my life is not exempt from little issues that cause big delays. Roster changes and family stuff has to take precedence. So thanks for being as kind and understanding as you are.

I’ve begun working on the final post in this series (playing the game) and I aim to have that completed in the next week or so. So keep an eye out for that.

Till next time

Andrew


Resources

This series so far:

Staying in Contact

Interested in keeping in touch or discussing posts, pages and ideas?  You can do that in several ways by:

    • Commenting on this post (I read and answer each one)
    • Sending me a note using our About page (email)
    • Connecting with us on Facebook at Andrew’s Trains

Ops Downloads – how useful are you finding them?

I’m pleased to see a large number of downloads of the operations files for the maintenance centre layout. I’m wondering how useful and easy to use you have found them so far?

Part 6 will be coming this weekend, likely Sunday night. That will be followed up by the last part in this series a week or so later on. Thanks for following along. It’s an honour that you have found something I’ve written of value.

More later this week

Andrew


Resources

This series so far:

Staying in Contact

Interested in keeping in touch or discussing posts, pages and ideas?  You can do that in several ways by:

    • Commenting on this post (I read and answer each one)
    • Sending me a note using our About page (to me as an email)
    • Connecting with us on Facebook at Andrew’s Trains