Category Archives: Layouts

All layout subjects

Site seeing – Op till you drop – Blue flag “Video” edition – August 26, 2018

In my August 18 post we looked at modelling and using Blue Flags for your operating sessions. Thanks to Charles Malinowski’s timely reminder, there’s an additional video for context.


MRR Video Series – Taking Care of Business

Model Railroader magazine has a series of videos (most are pay to play). However some of the best of them are free for you to watch. One of these focuses on the SMS Rail Lines industrial park in New Jersey.

I did try to embed their video (as they offer this as an option – like YouTube) however, it didn’t work. Instead you’ll find below the link for the video. THis will take you straight to the page and then play away.

The video is narrated and professionally shot and edited. It is really well done and shows the operations in the Industrial Park and the blue flag in action. Thanks to Charles for reminding me of the video. I hope that you all enjoy watching and learning.

Don’t forget to comment on and share this post with your friends.


Resources

Taking Care of Business: SMS Rail Lines

Site seeing – Loco dead line edition – August 20

Locomotive dead lines make fascinating modelling subjects. One layout idea that has percolated along for the last couple of years relates to a locomotive rebuilder. A recent post by one of my favourite modellers, Mike Confalone, over on the Model Railroad Hobbyist forums, provides a great starting point.


Modelling a deadline

One layout idea that’s been percolating along for the last couple of years relates to a locomotive rebuilder. One aspect of that design is the deadline, that is, the line of locomotives waiting for work to begin on their rebirth, parts removal for donation to other units, and for some the final indignity – the cutters torch and a change of state to scrap metal. Fortuitously, a small project by Mike Confalone over on the Model Railroad Hobbyist forums has been focused on a deadline too.  Mike writes in the post that:

On the proto-freelanced Allagash, we have a caboose track at Madrid. With the move to 1984 a few years back, the caboose track is used less and less as cabooses begin to become less common. We still run them on most of the road jobs, but most of the locals go without, per the prototype in that era. So, I’ve converted the caboose track to a diesel deadline. Its a bit tight but it’s the only available real estate in the yard and I didn’t want to put them on a remote siding. I wanted the deadline near the engine house. Seemed to make sense.

Click the photo above to go straight to the MRH forum post

There’s five pages of comments and information there as of my writing this post. Being a fan of Mike’s work I may be biased. However, I find his work to be of the highest quality and well worth the time to review. I hope that you feel the same way after you’ve read through the thread.


Resources

  • There is a Megastructures documentary (Mega Breakdown – train overhaul) that is worth watching for an overview if you haven’t seen this type of operation before:

 

 

 

 

 

 

Site Update – August 10 2018

Facebook has recently made changes to the way that bloggers make posts to their primary profile page. In essence this means that they broke the way that WordPress and others could post updates from their blogs.

The only option has been to create a page and connect to that. So, to continue to make sure that posts continue to appear on Facebook, and through exhaustive research and audience consultation (1 person said they had no idea either) I’ve created the Andrew’s Trains page. All the posts will now appear there (as well as here obviously) as a large part of the followers of the blog find information about this site on FB.

The devil is always in the details.

New day, new challenges, new solutions. See you all in the funny papers.

Site seeing – Saturday morning video watching edition

It’s been a while since I’ve had the time to post. A range of reasons you’re all familiar with – work, tiredness, time pressure and the needs for others among them. And then that this is at the moment a hobby and not my primary income source (sigh).

While taking a little time out for myself in the early morning (before the sun came up on a very chilly day in Ballarat) I rediscovered the video produced by the folks over at Model Railroader on model railroad operations. Hosted by the late (and greatly lamented Andy Sperandeo) this video is a great introduction to operations, without all the paperwork, and other stuff that can hamper your entry into the realm.

I hope you enjoy, and it is great to share with you Andy’s wit and personality. I miss being able to chat with him as I did every now and then online about operations and the finer points he knew from a lifetime of modelling. Have a great weekend.

Site Seeing – the I’ve got a model room edition – April 1

I’ve been without a modelling space, a dedicated out of the line of fire, not on the kitchen table, leave all your stuff out, style space since the late 80s. A recent move has seen us in a larger space with two spare rooms and a space for our library.

Over my 2 week break from work I’ve gone through my boxes, trying to find all of my collected modelling tools, and I have for the most part succeeded. I’m still missing some critical stuff like my Chopper 2 and Duplicutter along with my set of beading tools that I use to cut a range of river heads. There in a box somewhere but for the life of me I cannot find the blessed thing. Same goes for the NWSL products. I know they’re there, I just cannot say quite where that is for now.

I’ve emptied my mobile toolkits (large and small fishing tackle boxes, and carry totes) to get all of my tools and bits out of the dark and onto the table – making the space look like a the remains of a tornado. So no photos yet – I do have some pride. However, in the short space of time I’ve managed to part complete three little rebuilds from Athearn BB kits, which is more modelling that I have been able to complete in quite a while.

There is a bit of work to get the room into shape. I have a list of honey-dos among them is to build bookcases for our library room. I will add to that list as I need some in my modelling room. These will serve their obvious purpose as well as a base for the switching layout that will be permanently setup in there. More on that in a couple of weeks when I find a tape measure to measure up the room and begin to design something that fits inside the house, and not in the soon to be very cold garage.

I managed to pick up a glass top work desk for $35 Aussie from a local thrift shop (similar to the image on the left). A couple of twists to tighten screws and the judicious use of my allen keys to tighten everything up and the thing is as good as new. The glass top will aid in making scratchbuilt items too.

It has been fun working with my Waldron punch sets and the Historex Hex punch sets and I have to restock all of my depleted punched out bolt heads, and circle plates (great for diesel detailing) from the different grades of styrene.

I’ll post some photos over the next week or two as I get things sorted out. All the best.

 

 

Site Seeing – the Model RR to Go edition

Good day readers wherever you may be, and whatever you may be doing. It has been a while since my last post. That’s mainly down to my work schedule being all-consuming, and the days being long and the start times being all over the clock face. Nine months into my new role as a tram driver I’ve just managed a couple of weeks off and needed every moment to recover.

While recovering and looking around for some layout baseboard design ideas today I stumbled across Rick De Candido’s Fillmore Avenue Roundhouse blog.

His section of layout concepts (click this link to open a new window) has several great ideas. He really thinks outside the box on many of his designs. There is such creativity from this space starved modeller.


POST UPDATE – August 8, 2019
It appears that Rick’s WP site has been removed. I’m trying to contact him through multiple sites to see if there is a new site for this layout. I’ll do my best to keep this post updated.

His terminal layout is something to see too, and can utilise up to 6 operators on the layout during each 2.5 hour operating session. Well worth the time to visit the site and take a long read through the many useful posts there. Thanks to Rick for sharing his passion.

Rick’s Fillmore Avenue Roundhouse layout

Unfortunately I have no contact details for Rick, and there is nothing on the site where I can post a comment to let him know that I’ve profiled his site. If any of you can help with getting me in touch with Rick would you please reply to this post?

Site update – Tram pictures update – A2 Class edition

I’ve updated the Melbourne A2 class page with additional photos of the Southbank assigned units.

I’ll continue to update photos as I find or take them.

Site Seeing – January 1 – The new Everard Junction version

Everard Junction was a great finished model railway filling the loft of Richard Warren’s home in the UK (his YouTube channel can be watched here). However, he was unhappy with several key elements to the underlying baseboard design and issues with the loft space itself  that were causing running issues due to temperature and moisture. So he took what I consider to be a brave step and decided to start again from scratch.

With the loft area now completely reworked, insulated and ready to go, the work to build the new Everard Junction (Mark II?) is underway. As I write there are four videos in the current build series with more to come. With much detail each shows what ideas and issues Richard is solving as he builds the new layout. Richard’s baseboard design shows the very serious thought he has put into the new build. A couple of his ideas will make it into my next baseboard design, specifically allowing a removable backscene within the body of the baseboard.

Click the videos below to being watching, and if you find them interesting head over to the YouTube channel and like and subscribe. There’ll be more content about the build shortly and Richard is very good at presenting his ideas and showing his working method. Now onto the videos.

Videos

New Layout Build – Baseboards

Layout Update – November 2017

New Layout Build – Backscenes

New Layout Build – Fiddle Yard

There are a heap of videos on his channel that should be watched for their ideas and his modelling is outstanding. Enjoy Richard’s work; I do.

Site Seeing – August 7 – Master class: Operating Session

A recent post on the Model Railroad Hobbyist site by Tim Garland and the associated video (see below) shows the realism and enjoyment that can be achieved by operators with little cost beyond the time to set up and the time to operate.

What I enjoyed most out of this operating session video was the way that both Tim (who works as an Engineer for NS) and Tom Klimoski (the layout owner) work together as a team to get the ‘work’ done in a professional way, without hassle, in a small layout space, all the time working the layout to get the switching work done. Better was the way that you cannot see the engineer (Tom in this case) only the conductor on the ground working the cars into place.

Watch the video below and share your thoughts here or on Facebook.

At the Recent Ballarat Model Railway show (June 2017) I managed to catch up with a long time railway mate and his layout. When I saw this video I forwarded it onto Neil as a teaching tool to help him get operations going on his own layout. I think that what Tom Klimoski has recorded is the gold standard for small layout operations. It shows how (and I’m guessing on time) over a shorter operating session two people can work and have a lot of fun switching. Maximising the usefulness of a small layout by following the rules as set out, and by opening and closing gates, calling out the moves, and so on makes such a difference. I hope that you enjoy the video as much as I did.

Additionally there is a great post by Tim going on over at the MRH site about this video. Click the link at the top of the post for more. Lots of really good stuff in that post for the operator as well.

Site Update – The end of a work era

Since 1982 I have worked in the Telecommunications and Information Technology industry. I’ve worked as a technician, technical officer, sales representative, Helpdesk staffer, IT Manager and for the last 10 years as a specialist and consultant service delivery manager. That all comes to a close today. I move on to a new career in the public transit industry as a tram driver. In some ways I’m very sad to leave behind the people and the skills I’ve learned and nurtured for the greatest part of my working life.

The IT life is not all that glorious though. I wont miss the constant stress and never-ending drive needed to keep up and get ahead of the game. The incredibly thankless tasks that you get to do all day, and often part of the night. Not for IT staff is overtime, shift penalties, and Rostered Days off. Just that never-ending all hands to the pump work ethic, and hopefully no heart attack.

Today is a point from which to look forward, not backward. Thus begins the next 15 years of my work life. This is something I’ve wanted to do since I was a boy after I rode the footplate of a steam locomotive, my Uncle Col Casbolt in charge, in Sydney’s western suburbs.

NSW 32 Class Locomotive 3325 has just arrived at Richmond (27 January 1968) –
Image courtesy of ARHS NSW – click image for page

My uncle had been a suburban train driver in the Sydney suburban network for a while then. He made the move from steam to the Sparks (EMUs as shown below) not long after this ride in the southern hemisphere’s spring of 1968 as best I can recall. (I was only 4, almost 5, at the time and hadn’t started school yet!)

NSW ‘Red Rattler’ sets F1 and W3 sit quietly in the old sheds at Redfern (image courtesy of Flying_Donkey@Flickr)

While this week has been a time of a lot of last moments, from this Friday forward I begin a life of firsts for the first time in a long time.

A Yarra Trams E Class Tram # 6015 on the Route 96 @ St Kilda – one of the routes I hope to be driving in 2017-18

I’m looking forward to the hard work and study required to be a fully competent tram driver on our network. And looking forward to becoming a part of the fabric of the city’s public transit network.

W8 Class No. 1010 (built 1955) and rebuilt in 2015-16 at Bendigo Tramway Museum on the City Circle route

I am sure you’ve noticed the volume of posts has dropped away over the last 4 months,  fear not. I’ve not been publishing much yet have been busy working away on a number of smaller projects and layout designs and expect to start building a small switching layout for my son in August. So I hope you can join me in the journey for that project.

While I’ll be working odd hours, studying hard and hoping to pass all of my written and driving exams with flying colours, I do expect to have a little more time to post on the HVL. And of course I expect to have a lot more pictures of trams, with views that I’ve never been able to get before. Looking forward to sharing. Thanks for reading a long and sharing the journey.

Andrew