20191005_182435 05/10/2019 648 × 1120 Evans Hollow Industrial: Build Update The brass rod has yet to be drilled through the layout edge. Aiming to get that done this weekend Then the wire can be inserted into the tube and mounted to switch in preparation for the dpdt switched to be mounted. Like this:Like Loading… Share this: Share on Facebook (Opens in new window) Facebook Share on LinkedIn (Opens in new window) LinkedIn Email a link to a friend (Opens in new window) Email Like this:Like Loading…